§ 7-1.250. Completion of work: Restoration of rights-of-way.  


Latest version.
  • Upon the completion of the encroachment work authorized by a permit issued pursuant to the provisions of this chapter, the permittee shall restore the right-of-way, including the bridges and any other structures thereon, by replacing, repairing, or rebuilding the right-of-way in accordance with the specifications or any special requirements, but not less than to its original condition before the encroachment work was commenced. The permittee shall remove all obstructions, materials, and debris upon the right-of-way and shall do any other work necessary to restore the right-of-way to a safe and usable condition as directed by the Director of Public Works. Where excavations occur within areas already paved, the Director of Public Works may require temporary paving to be installed within twenty-four (24) hours after the excavated area is backfilled.

    In the event the permittee fails to act promptly to restore the right-of-way as set forth in this section, or should the nature of any damage to the right-of-way require restoration before the permittee can be notified or can respond to notification, the Director of Public Works may, at his option, make the necessary restoration. The permittee shall reimburse the City in accordance with the schedule of fees adopted by the Council.

(§ 12138, S.V.M.C.; as amended by § 3, Ord. 847, effective October 19, 1995)