§ 9-26.040. Commercial and Industrial District General Development Standards  


Latest version.
  • A.

    CO, CN, CR, CC, CPD, CI, LI, and GI Zoning Districts and BP Overlay District. Subdivisions, new land uses and structures, and alterations to existing land uses and structures, shall be designed, constructed, and/or established in compliance with the requirements in Table 2-6, in addition to those in Sections 9-26.050 and 9-26.060 as applicable, and the applicable development standards (e.g., landscaping, parking, loading, etc.) in Article 3 (Development and Operational Standards).

    B.

    RCC and BP districts. Development standards for projects proposed within the RCC and BP districts shall be determined by the applicable specific plan.

    TABLE 2-6 - COMMERCIAL AND INDUSTRIAL DISTRICT
    GENERAL DEVELOPMENT STANDARDS

    Development Feature Requirement by Zoning District
    CO CN CR CC
    Minimum lot size Minimum area and width for parcels proposed in new subdivisions.
     Area Determined through subdivision process
     Width 100 ft
    Setbacks Minimum setbacks required. See Section 9-30.080 for setback measurement and exceptions to setbacks.
     Front and street side 20 ft for structures more than 20 ft in height, 20 ft, plus 1 additional ft for each ft or portion thereof by which the structure exceeds 20 ft in height. 100 ft
     Sides (each) None required unless located adjacent to a residentially zoned parcel. In those cases the setback shall be 20 ft, plus 1 additional ft for each ft or portion thereof by which the structure exceeds 20 ft in height.
     Rear
    Height limit Maximum allowed height of structures; see Section 9-30.060 for height measurement and exceptions to these height limits.
     Primary structures 48 ft and 3 stories, except as provided by Section 9-26.050 1 story (maximum 18 feet) 35 ft As specified by Conditional Use Permit
     Accessory structures 25 ft
    Minimum Landscape Coverage 15% 15% 15% 25%
    Parking As required by Chapter 9-34 (Parking and Loading Standards)
    Roof Equipment All roof-mounted equipment, vents, or ducts shall not be visible from any abutting lot or any street or roadway. This shall be accomplished in a manner that is architecturally integrated with the main building.

     

    TABLE 2-6 - COMMERCIAL AND INDUSTRIAL DISTRICT
    GENERAL DEVELOPMENT STANDARDS - Continued

    Development Feature Requirement by Zoning District
    CPD CI BP Overlay LI GI
    Minimum lot size Minimum area and width for parcels proposed in new subdivisions.
     Area Determined through subdivision process
     Width Determined through subdivision process
    100 ft
    Setbacks Minimum setbacks required. See Section 9-30.080 for setback measurement and exceptions to setbacks.
     Front and street side 20 ft for structures more than 20 ft in height, 20 ft, plus 1 additional ft for each ft or portion thereof by which the structure exceeds 20 ft in height.
     Sides (each)
     Rear
    None required unless located adjacent to a residentially zoned parcel. In those cases the setback shall be 20 ft, plus 1 additional ft for each ft or portion thereof by which the structure exceeds 20 ft in height.
    Height limit Maximum allowed height of structures; see Section 9-30.060 for height measurement and exceptions to these height limits.
     Primary
    structures
    48 ft and 3 stories, except as provided by Section 9-26.050 48 ft 48 ft and 3 stories, except as provided by Section 9-26.050 48 ft 48 ft
     Accessory
    structures
    25 ft
    Minimum Landscape Coverage 10% 10% 15% 10% 10%
    Parking As required by Chapter 9-34 (Parking and Loading Standards)
    Roof Equipment All roof-mounted equipment, vents, or ducts shall not be visible from any abutting lot or any street or roadway. This shall be accomplished in a manner that is architecturally integrated with the main building.

     

(§ 5, Ord. 1085, eff. January 6, 2006 as amended by § 3 (Exh. B), Ord. No. 1193, eff. July 19, 2012)