The Building Director shall not conduct a final inspection of any building, structure,
or other facility, and shall withhold the approval of public utility connections thereto,
unless the curbs, gutters, sidewalks, drainage facilities, and street paving required
by the provisions of this chapter have been completed, or, when permitted, a bond,
cash deposit, or other security to guarantee such construction has been posted with
the City and approved by the Building Director, unless such requirements have been
waived in accordance with the provisions of Section 9-5.09 of this chapter.
(§ 8400-6, S.V.M.C.)